GUNDORF





Reference Scenario:

Untreated cattle manure stored in lagoons: main source of uncontrolled methane emissions
Biogas Plant Gundorf


Project Type, Location: Biogas Plant, Leipzig, Germany


Project Specification: Digestion of appr. 35.000 m³ cattle manure yearly, plus little amount of coferments; Combined heat and power production (350 kW-el); Power fed in public grid; Utilization of heat for enterprise and residential building


Project Status: Operation started in 2003


Service Spectrum ARA: Validation management: preparation of the project design document (PDD) and management of the entire validation and certification process; Verification management incl. Reporting; Sale of VERs; Integration within biogas C02mpetence®


Aspects to GHG Reduction: Reduction of uncontrolled emissions of the GHG methane during storage of cattle manure through technical digestion as project activity; Production and utilization of power and heat out of renewable energy sources, substitution of fuel; Verified GHG reductions within the 1st crediting period (1 year): 4.798 tons of CO2e


Validation Certificate: Validation Certificate





Verification Certificate: Validation Certificate




News
Start of project development of biogas plant Großkayna.
Landfill gas project Zámbiza, Ecuador, well advanced for CDM approval.
35.223 tons CO2 equivalents from domestic offset project Sandbeiendorf verified and sold. Additionality proven.
Equity share of biogas plant Euskirchen returned to project operator after a successful plant installation.
4.798 tons CO2 equivalents from domestic offset project Gundorf verified and sold. Additionality evaluated.