|
|
| Project Type, Location: | Photovoltaic Installation, school, Mülheim/Ruhr, Germany |
| Project Specification: | Power production with photovoltaic modules with a peak capacity of 11,6 kW and an annual energy output of 10.000 kWh
|
| Project Status: | Operation started in the mid of 2005
|
| Service Spectrum ARA: | Engineering and plant design; Equity and loan acquisition
|
| Aspects to GHG Reduction: | Annual reduction of GHG: appr. 5 tons of CO2e |

