ARA Logo biogas plant
deutsch | italiano          Contact | Imprint | Links | Home    

SANDBEIENDORF



Biogas Plant Sandbeiendorf


Project Type, Location: Biogas Plant, Sandbeiendorf, Germany


Project Specification: Digestion of appr. 70.000 m³ swine manure yearly, plus little amount of coferments; Combined heat and power production: 3 co-generation gas engines in total of 850 kW-el, Power fed in public grid; Utilization of heat for swine raising


Project Status: Operation started in 2003


Service Spectrum ARA: Validation management: preparation of the project design document (PDD) and management of the entire validation and certification process; Additionality Proof; Verification management and Monitoring Report; Sale of VERs; Integration within biogas C02mpetence®


Aspects to GHG Reduction: Reduction of uncontrolled emissions of the GHG methane during storage of swine manure by technical digestion; Production and utilization of power and heat out of renewable energy sources, substitution of fuel and natural gas; Annual reduction of GHG: appr. 17.000-18.000 tons of CO2e


Validation Certificate: Validation Certificate





Verification Certificate, Crediting Period 2004 Verification Certificate 2004





Verification Certificate, Crediting Period 2005 Verification Certificate 2005




News
Start of project development of biogas plant Großkayna.
Landfill gas project Zámbiza, Ecuador, well advanced for CDM approval.
35.223 tons CO2 equivalents from domestic offset project Sandbeiendorf verified and sold. Additionality proven.
Equity share of biogas plant Euskirchen returned to project operator after a successful plant installation.
4.798 tons CO2 equivalents from domestic offset project Gundorf verified and sold. Additionality evaluated.