|
|
| Project Type, Location: |
Biogas Plant, Sandbeiendorf, Germany
|
| Project Specification: |
Digestion of appr. 70.000 m³ swine manure yearly, plus little amount of coferments; Combined heat and power production: 3 co-generation gas engines in total of 850 kW-el, Power fed in public grid; Utilization of heat for swine raising
|
| Project Status: |
Operation started in 2003
|
| Service Spectrum ARA: |
Validation management: preparation of the project design document (PDD) and management of the entire validation and certification process; Additionality Proof;
Verification management and Monitoring Report; Sale of VERs; Integration within biogas C02mpetence®
|
| Aspects to GHG Reduction: |
Reduction of uncontrolled emissions of the GHG methane during storage of swine manure by technical digestion; Production and utilization
of power and heat out of renewable energy sources, substitution of fuel and natural gas; Annual reduction of GHG: appr. 17.000-18.000 tons of CO2e
|
| Validation Certificate: |

|
| Verification Certificate, Crediting Period 2004 |

|
| Verification Certificate, Crediting Period 2005 |

|