ARA Logo biogas plant
deutsch | italiano          Contact | Imprint | Links | Home    

WIETZENDORF



Waste Water Treatment System


Project Type, Location: Waste Water Treatment System,Wietzendorf, Germany


Project Specification: Complex of waste water treatment, refining and energy generation of organic highly contaminated fluxes from a potato starch production; Protein recovery, Fertilizer generation, Water purification, combined heat and power production: 4 co-generation gas engines each of 2,1 MW-el


Project Status: Operation started in 2002


Service Spectrum ARA: Calculation and financial modelling; Project development digestion unit; Calculation of GHG-emission reductions by the project


Aspects to GHG Reduction: Avoidance of yearly appr. 650.000 truck-km for waste water transportation and utilization; Production and utilization of power and heat out of renewable energy sources (organicly contaminated waste water), substitution of natural gas; Reduction of pump energy due to dropping a watering system for surrounding fields; Annual reduction of GHG: appr. 3.500 tons of CO2e




News
Start of project development of biogas plant Großkayna.
Landfill gas project Zámbiza, Ecuador, well advanced for CDM approval.
35.223 tons CO2 equivalents from domestic offset project Sandbeiendorf verified and sold. Additionality proven.
Equity share of biogas plant Euskirchen returned to project operator after a successful plant installation.
4.798 tons CO2 equivalents from domestic offset project Gundorf verified and sold. Additionality evaluated.